Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    BRITAIN-BOUND: NDDC Huge Drive to Send Top Talents to UK Universities

    22 May 2026

    Interswitch Unveils Digital Forecourt Suite with ‘Pay-As-You-Want’ Capability at NNPC Retail Transformation Summit

    22 May 2026

    Hamzat Vows To Work For All Lagosians After Landslide Victory In APC Guber Primary

    22 May 2026
    Facebook X (Twitter) Instagram
    LinkedIn X (Twitter) Instagram
    Starconnect Media
    Subscribe Login
    • Home
    • News
    • Business
    • Lifestyle
    • Health
    • Entertainment
    • Football
    • Media
    Starconnect Media
    • Home
    • News
    • Business
    • Lifestyle
    • Health
    • Entertainment
    • Football
    • Media
    • MORE
    Home»Business»Energy»NERC orders EEDC to refund ₦474,744 to customer, replace faulty meter
    Energy

    NERC orders EEDC to refund ₦474,744 to customer, replace faulty meter

    starconnectBy starconnect6 July 2025No Comments3 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp VKontakte Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    MADUAKO IGBOKWE I Sunday, July 05, 2025

     

    ENUGU, Nigeria – The Nigerian Electricity Regulatory Commission (NERC) has directed the Enugu Electricity Distribution Company (EEDC) to write off ₦474,744 in electricity bills issued to Mrs. Agbai Andy Obumneme Joy Nkiruka due to multiple billings.

    According to NERC, EEDC confirmed that Mrs. Agbai’s outstanding balance before the installation of a prepaid meter was ₦72,956.88. Despite this, EEDC continued to bill her after she was migrated to a prepaid system, thereby accumulating unauthorized charges. NERC has ordered that all bills issued after metering be written off.

    The directive follows a petition filed by Mrs. Agbai, who claimed that her three-phase prepaid meter installed at her residence by the Power Holding Company of Nigeria (PHCN) on May 16, 2012 was declared expired by EEDC staff after multiple inspections since December 2023.

    Mrs. Agbai also alleged that her application for a new meter, submitted on July 20, 2024, was ignored.

    She further stated that since October 2024, EEDC had been sending her estimated bills exceeding ₦60,000 per month, which she deemed unsustainable as she does not own or use an air conditioner.

    She added that when her meter was functional, her monthly recharge never exceeded ₦25,000, and there was no justification for the inflated estimates.

    Mrs. Agbai contested the sudden appearance of an alleged outstanding arrears of ₦547,700.92 on her account, which she claimed did not exist at the time her meter was installed in 2012. She insisted that she owed no arrears and stated that since around 2014, she had been recharging her meter using the prepaid system.

    She explained that prior to migrating to prepaid in May 2014, she received monthly postpaid bills from EEDC, which she paid regularly. She requested that EEDC verify these records.

    In her petition, Mrs. Agbai asked for the disputed ₦547,700.92 to be removed from her account and for her faulty meter to be replaced with a functional three-phase unit.

    NERC confirmed that the meter at Mrs. Agbai’s residence is indeed faulty. In line with Order E on the structural replacement of faulty or obsolete meters under the Nigerian Electricity Supply Industry (NESI) guidelines, EEDC is required to replace the meter within one month.

    NERC further stated that although the customer’s verified arrears prior to metering stood at ₦72,956.88, EEDC continued to bill her post-migration until 2022, resulting in the inflated arrears of ₦547,700.92. Therefore, EEDC must write off ₦474,744.04 the difference accumulated after she was switched to a prepaid meter.

    NERC ordered EEDC to adjust all estimated bills issued to Mrs. Agbai from October 2024 to date, using the average of her last three months of vending before the meter became faulty. This billing method is to be maintained until a new meter is installed.

    The Commission emphasized that this directive aligns with Section 36(2)(2) of the Customer Protection Regulations (CPR), 2023, and Order H of the amended order on the capping of estimated bills for EEDC PLC.

    In accordance with Section 25(1)(c) of the CPR 2023, NERC also directed that EEDC must not disconnect Mrs. Agbai based on the disputed arrears until the necessary adjustments have been completed.

    Meanwhile, the customer is to pay her current bills based on her average past metered consumption.

    Despite the directive, Mrs. Agbai reported that while EEDC has replaced her meter, it was replaced with a single-phase meter instead of the required three-phase. Furthermore, the new meter is non-functional, leaving her without electricity since its installation.

    Post Views: 14,603
    EEDC
    Share. Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Email
    Previous ArticleNDDC donates relief materials to Communities in Bayelsa
    Next Article How we are improving food and agriculture production in Nigeria – Tinubu 
    starconnect
    • Website
    • X (Twitter)

    Related Posts

    The Lagos With 24/7 Electricity Plan Unveiled

    19 May 2026

    Seplat Energy Grows 2026 Q1 Revenue to $840.7m, Gross Profit Hits $370.5m

    30 April 2026

    Oil hits four-year high as US-Iran blockade rattles energy markets

    30 April 2026

    UAE Quits OPEC in Seismic Shift for Global Oil Markets

    28 April 2026
    Leave A Reply Cancel Reply

    Ads
    Our Picks

    BRITAIN-BOUND: NDDC Huge Drive to Send Top Talents to UK Universities

    22 May 2026

    Interswitch Unveils Digital Forecourt Suite with ‘Pay-As-You-Want’ Capability at NNPC Retail Transformation Summit

    22 May 2026

    Hamzat Vows To Work For All Lagosians After Landslide Victory In APC Guber Primary

    22 May 2026

    Emirates Skywards launches global ‘Season of Rewards’ campaign for members worldwide

    22 May 2026

    Lagos 2027: Now that the coast is clear for Hamzat

    22 May 2026
    About Us
    About Us

    Starconnect Media is your trusted source for timely and relevant news. We are a dynamic news media platform dedicated to delivering accurate, insightful, and engaging content across a wide range of topics.

    Our mission is to keep you informed and connected to the stories that matter, both locally and globally.

    Our Picks

    BRITAIN-BOUND: NDDC Huge Drive to Send Top Talents to UK Universities

    22 May 2026

    Interswitch Unveils Digital Forecourt Suite with ‘Pay-As-You-Want’ Capability at NNPC Retail Transformation Summit

    22 May 2026

    Hamzat Vows To Work For All Lagosians After Landslide Victory In APC Guber Primary

    22 May 2026
    Ads
    LinkedIn X (Twitter) Instagram
    © 2026 Starconnect Media | All rights reserved. Designed by Adeyinka Adenaike.

    Type above and press Enter to search. Press Esc to cancel.

    Go to mobile version

    Sign In or Register

    Welcome Back!

    Login to your account below.

    Lost password?