Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    ​BLOOD IN THE DORM: 21 Dead as Ukraine Missile Blitz Hits Teen School Hostel in Russian-Held Lugansk

    24 May 2026

    ​Breakthrough in Islamabad: U.S. and Iran Agree to Framework Freezing War, Unlocking Assets, and Setting Nuclear Clock

    24 May 2026

    APC Presidential Primary: Tinubu Wins Own Ward L2 In Eti-Osa LG

    23 May 2026
    Facebook X (Twitter) Instagram
    LinkedIn X (Twitter) Instagram
    Starconnect Media
    Subscribe Login
    • Home
    • News
    • Business
    • Lifestyle
    • Health
    • Entertainment
    • Football
    • Media
    Starconnect Media
    • Home
    • News
    • Business
    • Lifestyle
    • Health
    • Entertainment
    • Football
    • Media
    • MORE
    Home»News»Kwankwaso lied when he said North marginalized by Tinubu on road infrastructure – Umahi
    News

    Kwankwaso lied when he said North marginalized by Tinubu on road infrastructure – Umahi

    starconnectBy starconnect26 July 2025Updated:26 July 2025No Comments9 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp VKontakte Email
    Former Governor of Kano State, Mr. Rabiu Kwankwaso
    Share
    Facebook Twitter LinkedIn Pinterest Email

     

    Admin I Saturday, July 25, 2025

     

    ABUJA, Nigeria – Minister of Works and Housing, Mr. David Umahi has said that former governor of Kano State, Alhaji Rabiu Kwankwaso lied when he said that the North is marginalized in road infrastructure.

    He listed roads done and ongoing road projects in the North.

    My attention as Honourable Minister of Works has been drawn to the unfortunate statement by His Excellency, Sen. Kwankwaso that President Bola Ahmed Tinubu, GCFR, is developing more roads in the South than in the North.

    2. I consider this statement as a grave misleading information made intentionally to deceive our brothers and sisters in the North and to pretend that he loves the North more than any other leader from the North. I consider  Sen. Kwankwaso’s statement as statement made out of desperation and as part   of his struggle  with few others who believe that they can inherit the impeccable legacy of our dear late President  Mohammadu Buhari, GCFR and that the only way available for them towards achieving same is to be divisive and pretentious. Trying to be  like  our late President Buhari cannot be a job of three decades and can not be done with deceit. I think our younger generation has such a chance and  which must be worked for through hard work, honesty, transparency and commitment to the unity of our country , a legacy that our late President Buhari, GCFR achieved in all his life on earth. May God continue to bless his legacies and give him a peaceful rest, Amen

    3. For the interest of all Nigerians, especially  our  dear brothers and sisters in the North, I wish to highlight  just a few key ongoing projects in each of the six Geo-Political Zones.

    4. The four legacy projects of President Bola Ahmed Tinubu, GCFR:
    a) Lagos-Calabar Coastal Highway, which is 750 km: As of today, a total of 110 km is ongoing within Lagos State and 65 km within Cross River and Akwa Ibom States. The total ongoing is 175 km  by 6 lanes or 350 km by 3 lanes in the South.
    b) The Sokoto-Badagry  Superhighway, which is 1068km: As of today, we have 258 km ongoing at Kebbi section and 120 km ongoing at Sokoto section. Total ongoing is 378 km  by 6 lanes or 756 km by 3 lanes in the North.
    c) Trans Sahara road spanning through Cross River – Ebonyi – Benue – Kogi – Nasarawa – Abuja, which is 465km: 118 km  by 3 lanes or 59 km by 6 lanes is ongoing in Ebonyi State – South.
    d) Akwanga – Jos – Bauchi – Gombe road, which is 439km: Project is being redesigned from flexible pavement to rigid pavement for more durable pavement as directed by Mr. President and to conform to the other legacy projects. In the four legacy projects, the North has 52% and South 48%. Within the ongoing projects as of today, the South has 409 km by 3lanes and the North has  756km by 3 lanes . The facts are there. I wonder why people don’t talk about other legacy projects of Mr. President but will always dwell on Lagos-Calabar Coastal Highway. This road has only 220 km by 3 lanes in Lagos State that is ongoing  now , crossriver and Akwaibom has 130km by 3 lanes that is ongoing whereas kebbi alone has 316 km by 3 lanes that is ongoing. Sokoto has 240 km by 3 lanes that is ongoing. I think Sen.  Kwankwaso is not fair to Mr.President and the unity of our country

    5. The following major projects are  also ongoing in the North.
    a)  Sokoto – Zamfara – Katsina – Kaduna road: This is 275 km dualized (750 km), costing about ₦824 Billion. This project is being handled by CBC, Triacta, Setraco, and Mothercat. Projects are ongoing mostly on reinforced concrete pavement. Despite the insecurity within this corridor, work is ongoing.
    b) Abuja – Kaduna – Kano road: 350 km dualized  (700km) project is being  constructed on concrete pavement with a total sum of ₦764 Billion with Infiouest Nig Ltd and 30% of the contract sum already paid and work is ongoing.
    c)  BUA Tax Credit  road passing through Jigawa, Katsina, and Kano States: 256 km dualized (512 km). Project redesigned and constructed on rigid pavement.
    d)  156 km of Zaria – Hunkuyi road is being constructed by mothercat Nig Ltd.
    e) The Kano Northern Bypass: 49 km is being constructed by CCECC.
    f)  The 100.9 km dualized (201.8 km) Kano – Jigawa road is being constructed by Triacta.
    g) The Bama and Dikwa roads (49+51= 100 km) by Dangote Tax Credit are ongoing in Borno State
    h) The  Borno  Ring Road: 110 km is being constructed by CCECC.
    i)  The 76 km Malando road in Kebbi State is being constructed by Episolyn Nig Ltd.
    j) The 250 km dualized (500 km) Benue to 9th Mile road costing $958 Million by China Harbour is ongoing.
    k) The dualization of Lokoja – Okene 86km dualized (172km) by CGC is ongoing.
    l) The sections 1 and 2 of Kaduna to Katsina roads by CCECC costing about ₦150 Billion is ongoing.

    6. Major ongoing projects in the South:
    a) Completion of Lagos – Ibadan 8.5 km costing ₦33 Billion by RCC.
    b) completion of Lagos to Sagamu 12 km dualized (24 km) and  flyovers by CBC costing
    c) completion of Oyo – Ogbomoso  to Ilorin Road costing ₦146 Billion by JRB
    d) Repairs of Carter bridge, Third Mainland bridge, Eko bridge with total contract sum of about ₦120 Billion

    e) In South East, we have:
    i. Completion of Enugu – Onitsha road by MTN tax credit which is 107 km costing ₦202 Billion.
    ii. Completion of Enugu – Onitsha road by CBC, which is 72 km costing ₦150 Billion.
    iii. Enugu – Abakaliki 36 km road by reinforced global resources
    iv) 2nd Niger bridge access road in Anambra State, 17.5 km dualized with many bridges and flyovers – ₦175Billion by CGC Vii ) the completion of 61km dualized of lokpanta in Imo state to Enugu state by CGC costing 100bn

    f.) In South – South:
    i. Completion of Eleme – Onne road project, which is 30 km with bridges and flyovers costing ₦156 Billion.
    ii. Eket bypass road of 9.7 km dualized costing ₦76 Billion
    iii. Completion of East West Road section 2 which is ₦186 Billion by Setraco
    iv. Nembe Brass road costing ₦150 Billion.
    v) completion of Lokoja to Benin road by four contractors costing about ₦167 Billion
    vi) 2nd Niger bridge access road in Delta 17 km dualized by CCECC costing ₦146 Billion.
    Vii) completion of Bodo Bonny Road in rivers state 35 km with 12 bridges by julius Berger nig plc costing 200bn.

    7. I have a duty in the coming week to publish all inherited projects and new projects that are either completed or ongoing in this present administration .

    I can say with all sense of responsibility that President Tinubu is a fair President. He has favoured the North in road development more than the South, especially North West, where Sen. Kwankwaso comes from.

    Apart from these four legacy projects, 80% of the above named ongoing projects were projects awarded by the past administration towards the end of that administration in 2023 but never took off effectively which President Tinubu decided to continue to fund towards completion. If he had abandoned them, same people will complain. I have been under pressure by some stakeholders for the  construction of  their major roads like the abandoned Ibadan – Oyo by Arab contractor , Ibadan – Ife – Ilesa, Ilesa – Akure – Benin and Ore – Sagamu road. I have been badly accused that I am only doing projects in the North, especially North West.

    Third Mainland bridge is being closed down to heavy  trucks because of  underwater structural defects. The Carter bridge is so deformed that it needs to be removed and reconstructed. These are the real major projects in South West which I have been appealing to Mr President to give me money to do those projects because the people of South West may think that I am doing nothing about the major projects in their zone.

    These projects are projects that are within major economic corridor between the South and the North and deserve attention. Again, these bridges if allowed to further deteriorate will lead to serious economic consequences for the nation. Mr president is not only fair in completion of major inherited projects/ new projects but they are all within the major economic corridor of our nation. I will publish all ongoing projects which are above 20 billion naira each next week . We still have many projects within the six geopolitical zones that are not listed here . In this circumstance, I don’t know where Sen Kwankwaso got his misinformation from.

    8. It is unfortunate that the utterances of some of our political leaders are  just intended to deceive Nigerians and gain political favour instead of making statements that will unite the country and move her forward

    9. I will offer more explanation on this topic and ready to face a debate with anyone just to put the records straight.

    10. Let me say that in the ongoing NNPCL Tax Credit roads and bridges as inherited, the North has 53% while the South has 47% out of which South East has  only 4% and South West  only 5%.  The records are there with NNPCL . Mr. President did not complain about the unfair distribution of these inherited projects by the past administration but has continued to fund all the projects as inherited.

    11. To my brother, Senator Kwankwaso, you owe our President Tinubu an apology and a duty to withdraw your statement using the information I have provided herein for the benefit of Nigerians and the unity of the nation.

    12 I request the good people of Nigeria to ignore senator kwakwanso misleading statement and know that President Tinubu is fairly committed to developing every part of this country with fairness, equity and the fear of God

    -Sen. Engr. Nweze David Umahi, CON, FNSE, FNATE
    Honourable Minister of Works

    Post Views: 644
    Rabiu Kwankwaso
    Share. Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Email
    Previous ArticleObi’s Supporters After My Life
    Next Article Religion as a tool for national development (1) By
    starconnect
    • Website
    • X (Twitter)

    Related Posts

    ​BLOOD IN THE DORM: 21 Dead as Ukraine Missile Blitz Hits Teen School Hostel in Russian-Held Lugansk

    24 May 2026

    ​Breakthrough in Islamabad: U.S. and Iran Agree to Framework Freezing War, Unlocking Assets, and Setting Nuclear Clock

    24 May 2026

    APC Presidential Primary: Tinubu Wins Own Ward L2 In Eti-Osa LG

    23 May 2026

    ​THE DRONE RANGERS: Armed gang who shot female passenger and took 13 hostage defeated by high-tech police team in Edo jungle shootout

    23 May 2026
    Leave A Reply Cancel Reply

    Ads
    Our Picks

    ​BLOOD IN THE DORM: 21 Dead as Ukraine Missile Blitz Hits Teen School Hostel in Russian-Held Lugansk

    24 May 2026

    ​Breakthrough in Islamabad: U.S. and Iran Agree to Framework Freezing War, Unlocking Assets, and Setting Nuclear Clock

    24 May 2026

    APC Presidential Primary: Tinubu Wins Own Ward L2 In Eti-Osa LG

    23 May 2026

    ​THE DRONE RANGERS: Armed gang who shot female passenger and took 13 hostage defeated by high-tech police team in Edo jungle shootout

    23 May 2026

    ​THE CYBER CASANOVAS: Inside the Thai ‘Dark Room’ raid where Nigerian romance tricksters used AI avatars to trick older women out of life savings

    23 May 2026
    About Us
    About Us

    Starconnect Media is your trusted source for timely and relevant news. We are a dynamic news media platform dedicated to delivering accurate, insightful, and engaging content across a wide range of topics.

    Our mission is to keep you informed and connected to the stories that matter, both locally and globally.

    Our Picks

    ​BLOOD IN THE DORM: 21 Dead as Ukraine Missile Blitz Hits Teen School Hostel in Russian-Held Lugansk

    24 May 2026

    ​Breakthrough in Islamabad: U.S. and Iran Agree to Framework Freezing War, Unlocking Assets, and Setting Nuclear Clock

    24 May 2026

    APC Presidential Primary: Tinubu Wins Own Ward L2 In Eti-Osa LG

    23 May 2026
    Ads
    LinkedIn X (Twitter) Instagram
    © 2026 Starconnect Media | All rights reserved. Designed by Adeyinka Adenaike.

    Type above and press Enter to search. Press Esc to cancel.

    Go to mobile version

    Sign In or Register

    Welcome Back!

    Login to your account below.

    Lost password?