Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    BRITAIN-BOUND: NDDC Huge Drive to Send Top Talents to UK Universities

    22 May 2026

    Interswitch Unveils Digital Forecourt Suite with ‘Pay-As-You-Want’ Capability at NNPC Retail Transformation Summit

    22 May 2026

    Hamzat Vows To Work For All Lagosians After Landslide Victory In APC Guber Primary

    22 May 2026
    Facebook X (Twitter) Instagram
    LinkedIn X (Twitter) Instagram
    Starconnect Media
    Subscribe Login
    • Home
    • News
    • Business
    • Lifestyle
    • Health
    • Entertainment
    • Football
    • Media
    Starconnect Media
    • Home
    • News
    • Business
    • Lifestyle
    • Health
    • Entertainment
    • Football
    • Media
    • MORE
    Home»News»We Will Complete Imo-Rivers Link Road – NDDC Boss
    News

    We Will Complete Imo-Rivers Link Road – NDDC Boss

    starconnectBy starconnect3 March 2021No Comments2 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp VKontakte Email
    NDDC boss speaks on Imo-Rivers Link Road
    The Interim Administrator of the Niger Delta Development Commission, NDDC, Mr Efiong Akwa, speaking during the inspection of the 24-kilometre Avu-Adapalm-Etekuru Road in Imo State.First left is the Director of the Imo State Office, Mr Peter Edieya, while on the right is the contractor, Engr. Denis Odadah
    Share
    Facebook Twitter LinkedIn Pinterest Email

     

    Admin  l Wednesday, March 03, 2021

    PORT HARCOURT, Rivers – The Interim Administrator of the Niger Delta Development Commission, NDDC, Mr Efiong Akwa, says the Commission will put in more efforts to ensure the completion of the 24-kilometre dual carriage way linking Imo and Rivers states through oil-bearing communities in both states.

    Akwa stated this when he led a team of NDDC directors and engineers to inspect the road traversing several oil-producing communities. He explained that the road runs through Avu-Adapalm-Etekuru in Imo State to Ogba/Egbema Local Government Area of Rivers State.

    The NDDC Chief Executive Officer noted that the 24-kilometre dual carriage way was a very important project for the NDDC and the Niger Delta, “because it links rural communities in the oil-producing areas of Imo and Rivers states.”

    Akwa charged the contractor to return to site immediately as the NDDC was committed to building sustainable regional infrastructure, especially in the oil-producing areas. He said: “I have directed the contractor to report to the NDDC headquarters in Port Harcourt so that we can work out the details of what needs to be done to complete the project.”

    Speaking on the challenges facing the project, the contractor Engr. Denis Odadah, appealed for the payment of outstanding Interim Payment Certificates, IPCs, noting that the delays in funding was a major impediment to the completion of the project.

    The NDDC boss also inspected the completed 8-kilometre Obinze-Umuokanne Road with concrete drains, in Owerri West Local Government Area, connecting several food-producing communities.

    At the NDDC Imo State Office in Owerri, the Interim Administrator, who was taken round the premises and facilities by the Director of the State Office, Mr. Peter Edieya, urged the staff to cultivate a good maintenance culture.

    Akwa charged the management and staff to be proactive and take facilities in their offices as their own by taking good care of them. He urged them to consider themselves as ambassadors of the people that should work harmoniously with stakeholders and fellow staff for a better Niger Delta Region.

    Imo-Rivers Link Road
    Share. Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Email
    Previous ArticleNigeria will fail if FG continues to dialogue with bandits, leaving Intellectuals
    Next Article FirstWave seals 3 years deal with Moja Access
    starconnect
    • Website
    • X (Twitter)

    Related Posts

    BRITAIN-BOUND: NDDC Huge Drive to Send Top Talents to UK Universities

    22 May 2026

    Hamzat Vows To Work For All Lagosians After Landslide Victory In APC Guber Primary

    22 May 2026

    ​HORROR IN THE CLASSROOM: School Head, Benson Arinze Gets Life Jail Over Sickening Assault on Pupil, 6

    22 May 2026

    ​2027: Court Strips INEC of Power to Set Timetable for Party Primaries

    22 May 2026
    Leave A Reply Cancel Reply

    Ads
    Our Picks

    BRITAIN-BOUND: NDDC Huge Drive to Send Top Talents to UK Universities

    22 May 2026

    Interswitch Unveils Digital Forecourt Suite with ‘Pay-As-You-Want’ Capability at NNPC Retail Transformation Summit

    22 May 2026

    Hamzat Vows To Work For All Lagosians After Landslide Victory In APC Guber Primary

    22 May 2026

    Emirates Skywards launches global ‘Season of Rewards’ campaign for members worldwide

    22 May 2026

    Lagos 2027: Now that the coast is clear for Hamzat

    22 May 2026
    About Us
    About Us

    Starconnect Media is your trusted source for timely and relevant news. We are a dynamic news media platform dedicated to delivering accurate, insightful, and engaging content across a wide range of topics.

    Our mission is to keep you informed and connected to the stories that matter, both locally and globally.

    Our Picks

    BRITAIN-BOUND: NDDC Huge Drive to Send Top Talents to UK Universities

    22 May 2026

    Interswitch Unveils Digital Forecourt Suite with ‘Pay-As-You-Want’ Capability at NNPC Retail Transformation Summit

    22 May 2026

    Hamzat Vows To Work For All Lagosians After Landslide Victory In APC Guber Primary

    22 May 2026
    Ads
    LinkedIn X (Twitter) Instagram
    © 2026 Starconnect Media | All rights reserved. Designed by Adeyinka Adenaike.

    Type above and press Enter to search. Press Esc to cancel.

    Go to mobile version

    Sign In or Register

    Welcome Back!

    Login to your account below.

    Lost password?